Supplier Qualification · Tooling · OEM Sourcing

How to Evaluate a China Plastic Injection Molding Supplier

When you place a molding project in China you buy three things at once: a mold you do not yet own, a process window you cannot see, and a paper trail that decides whether either of the first two can be verified later. Price is the worst of the three to compare first, because it is the only one that is quoted plainly.

Injection molding machine with an open two-cavity mold and a freshly ejected white part, a robot arm at the next machine, and crates of black, natural and blue molded parts in a clean molding shop

At a Glance

Page typeSupplier qualification guide
CoversFactory · tooling · resin · sampling · cost
Applies toOEM buyers, product engineers, SQE
MarketsUS · DE · UK · FR · IT · NL
Our quality systemISO 9001:2015, project controls per order
Not claimedISO 13485 / IATF 16949 certificates
Quick Answer

The first question is not what a Chinese injection molding supplier can make, but who it is. Establish the legal entity, the production address and whether the machines belong to that entity; ask who owns the mold, who stores it and who may move it; ask for the resin grade rather than the resin family, with a certificate of analysis per lot; agree what T0 and T1 mean in the purchase order before the tool is cut; assign tolerances to the few dimensions that function and leave the rest general; and compare quotations on mold life, cycle time, scrap and tool maintenance rather than on the mold price alone. A supplier that can answer those six things in documents is usually a supplier that can also make the part. Everything on this page is written from the buyer's side of that conversation, including the part where we describe what we can and cannot evidence ourselves.

Who This Page Is For, and What It Deliberately Does Not Cover

This is a procurement guide, not a capability brochure. It is written for the person who has to sign the purchase order: an OEM buyer comparing three quotations, a product engineer who has to accept a T1 sample, or a supplier quality engineer who has been asked to approve a factory they have never visited.

This page coversWhere that detail lives instead
How to tell a manufacturer from a trader, and why the distinction changes the contract—
Mold ownership, custody, maintenance and transfer as separate rightsThe tooling process itself is on the custom injection mold page
What a DFM report has to contain before steel is cutProcess families, machine range and capability tables are on the injection molding services page
How to verify resin grade, lot and masterbatchMaterial property comparisons sit with the service pages
How to define sampling gates and approve a T1T0/T1/T2 as process stages are described on the mold page
How to compare total sourcing cost and manage engineering changes—

What it does not do is re-teach injection molding. If you need the process explained, the service page does that better, and repeating it here would only make both pages weaker. What follows assumes you already have a part, a drawing, and a shortlist.

Four Supplier Types, and What Each One Actually Sells You

Almost every disappointment in Chinese molding sourcing traces back to a mismatch between the type of supplier that was chosen and the type of responsibility that was needed. The four types below are not a quality ranking. They are four different commercial structures, and each one leaves a different gap for you to fill.

TypeWhat you are actually buyingWhere responsibility sitsThe gap you have to close
Integrated manufacturerTool design, tool making and molding under one roof and one legal entityOne counterparty for tool and part; internal escalation when a sample failsYou still have to verify the scope honestly — an integrated supplier can also buy tools out in a busy quarter
Injection molderMachine time and process knowledge; the tool is bought elsewhereSplit: the toolmaker owns tool defects, the molder owns part defectsTwo contracts and an argument waiting to happen when a defect could be either
ToolmakerA mold, sometimes with first samples; no production capacityTool quality onlyYou must qualify a second supplier to run the tool, and the tool must be proven on that machine
Trading company or sourcing agentCoordination, documentation and price aggregationContractually with the trader; physically with an unnamed factoryVisibility: you may never see the machines that make your part, and changes pass through a third party

The practical test is not "are you a factory" — everyone says yes — but "which entity would answer a recall notice". A trader can be a perfectly good partner for a commodity part with a stable design; it is a poor fit for a part whose tool you are paying for and whose process window you will need to reproduce in three years.

Why the type matters more than the price. On a first order, a trader and a factory can quote within a few percent of each other. The difference appears in year two, when the tool needs a repair, the resin grade is discontinued, or a batch fails and you need to know who owns the problem. That is a structural question, and it is decided by the type of supplier, not by the quotation.

Factory Identity: Whose Machines, at Which Address, Under Which Entity

The single most common sourcing surprise is not bad quality. It is discovering, after the tool is built, that the entity on the invoice is not the entity on the certificate, and neither of them is at the address where the parts are made. None of that is necessarily fraud; it is a normal consequence of how Chinese manufacturing groups are organized. It is still something you want to know on day one rather than in year three.

What to ask forWhat it actually provesWhat it does not prove
Business license with the registered addressThe legal entity exists and what it is allowed to doThat production happens there, or that the entity owns the machines
Quality certificate with the site address and scopeWhich site was audited, and whether molding is inside the certified scopeThat your specific part runs on that site — check the scope wording, not the logo
Machine nameplates and a walk-round video with the mold mountedThat the machines exist, at that site, in that configurationCapacity available to you, or whether the tool in the video is yours
Utility or property documents for the siteThat the site is operated by the entity, not borrowed for a visitAnything about quality
Subcontracting declarationWhich steps leave the site: plating, printing, assembly, sometimes moldingThat the declaration is complete — it is a statement, and it belongs in the contract

Three questions settle most of this in a ten-minute call. First: what is the exact legal name and address that will appear on the commercial invoice, and does the quality certificate name the same entity? Second: which production steps happen inside that address, and which are subcontracted? Third: if we audit, who will be standing in the room — the trading entity, the factory, or both?

The certificate question deserves its own sentence, because it is where buyers most often over-read a document. A certificate covers a scope and a site. A group holding ISO 9001 at one plant does not thereby hold it at a second plant; a certificate issued to a trading company does not certify the factory behind it. Reading the address and the scope line is a two-minute job that prevents a two-year assumption.

Mold Ownership Is Six Rights, Not One Sentence

"Customer-owned mold" is a phrase that appears in almost every Chinese tooling quotation and settles almost nothing. Ownership is a bundle of separable rights, and in a dispute the parties discover that they agreed on one of them and assumed the other five.

RightThe question it answersWhat to put in writing
TitleWho owns the physical tool, and does the tooling charge buy it outright or amortise it into part price?An explicit statement that title passes on payment, naming the tool by its identification number
CustodyWhere is the mold stored, and how is it identified among hundreds of others?A unique tool number on the mold, in the supplier's asset register, and on your purchase order
UseMay the tool run for anyone else, or produce parts outside your orders?An exclusivity clause, or a written statement that it does not — silence is not exclusivity
MaintenanceWho cleans, inspects and repairs it, at what interval, and who pays for wear versus damage?A maintenance interval in shots, a log you can request, and a split between normal wear and negligence
TransferCan you move it, in what condition, at whose cost, and with what documentation?A transfer procedure, a condition report at handover, and the packaging and freight responsibility
DataWho owns the mold drawings, the 3D tool model, the electrode and CAM files, and the steel certificates?An IP clause that lists the files, not just "the design"

The transfer right is the one that is most often assumed and least often tested. A tool that can physically be moved is not necessarily a tool that can be run elsewhere: if the process was developed on one machine, if the hot-runner controller is proprietary to the supplier, or if no process sheet exists, the next molder starts from zero and your transfer takes months instead of weeks. The cheap insurance is to require a process sheet and a tool drawing pack as deliverables of the first project, not as a favor at the end.

Two-cavity injection mold opened on a bench showing the cavity half with runner, the core half with ejector pins and an angled slider, guide pillars, water-line fittings and lifting eyes
A tool is an asset with a serial identity, a wear history and a set of files. The two halves on this bench are the visible part; the drawings, electrode set and process sheet are what make it transferable.

Mold life is the number everyone quotes and nobody defines. "500,000 shots" is a projection based on a steel grade, a surface finish, a resin and a maintenance regime — change any one and the number moves. Ask what the life estimate assumes: which steel, whether the cavity is textured, whether the resin is abrasive or glass-filled, and what maintenance interval is included. A tool quoted at a lower price with half the life is not cheaper; it is a different schedule of replacement.

Engineering Capability: What a DFM Report Has to Contain

Design for manufacturability is the cheapest stage of a molding project and the one most often reduced to an email saying "the part looks fine". The test of an engineering review is not whether it exists, but whether it names the features it would change and the cost of not changing them.

What the report should addressWhat it looks like when it is done properlyWhat it prevents
Wall thicknessA thickness map against the nominal, with the areas above and below flaggedSink marks on the visible face, and short shots at the far end of the flow path
Draft and textureDraft per surface, with texture depth converted into additional draftScuffing and ejection marks on a textured wall that had metal-safe draft but not texture-safe draft
Ribs and bossesRib thickness relative to the wall, boss wall relative to nominal, and gusset or coring proposalsSink over every boss, and cracking at the boss root after assembly
UndercutsA list of every feature that cannot release in the draw direction, with slider, lifter or redesign optionsA tool that needs two extra actions and a later, expensive modification
Gate locationProposed gate with the fill pattern and the resulting weld-line positions markedWeld lines across a cosmetic face, or a gate scar where the customer will see it
CoolingChannel layout and the expected temperature difference across the partWarpage and cycle time that nobody can explain after the tool is cut
EjectionEjector positions on a surface that can take a mark, with the expected forceWhite marks on a visible face, and parts that stick on the core
Parting lineThe chosen line, and what it does to appearance and to the shut-off facesFlash on a visible edge, and a parting line that crosses a sealing surface
Shrinkage and warpageThe shrink allowance per direction, with the material and fiber orientation behind itParts that are dimensionally right in the tool and wrong after 24 hours

Two of those deserve a note because they are the ones buyers most often discover too late.

Texture costs draft. A textured wall needs more draft than a polished one, because the texture is a series of microscopic undercuts. The rule of thumb used in toolmaking is roughly one additional degree of draft for every 0.025 mm of texture depth, and a heavy grain on a deep wall can need several degrees. A part designed with one degree of draft everywhere will mold cleanly in a polished tool and scuff in a textured one — and the drawing rarely says which.

Weld lines cannot be deleted, only moved. Where two flow fronts meet, the material has already cooled and the joint is weaker and visually different. A good DFM report says where they will land; a bad one lets them land on the face the customer photographs. If a weld line is structurally critical — a pressurized housing, a living hinge — moving it is a design change, not a process tweak, and it belongs in the review.

Two cut sections of gray molded housings side by side: one with a solid thick boss and a sink mark on the outer surface, one with a cored boss, gussets and even wall thickness
Same boss, two designs. On the left the solid section pulls a sink mark into the visible face; on the right the boss is cored and gusseted, so the wall stays even and the face stays flat. This is a drawing decision, made once.

Resin Verification: A Grade Is Not a Family

"ABS" on a quotation tells you almost nothing. ABS covers a range of impact strengths, flow rates and surface qualities that differ by a factor of two or more between grades, and the difference shows up in a drop test, a paint adhesion test or a color match long after the parts have shipped.

What to requireWhat it provesWhat happens without it
Resin manufacturer and exact grade codeWhich material the process was set up forA substitute grade with the same family name and different shrinkage, and a tool that no longer holds tolerance
Certificate of analysis for the lotMelt flow, density and filler content as delivered, not as advertisedNo way to separate a material problem from a process problem when a batch fails
Masterbatch carrier and let-down ratioWhether the color concentrate is compatible with the base resinColor streaks, and a drop in mechanical properties where the carrier does not bond
Glass fiber content and gradeThe shrinkage anisotropy and the wear rate on the toolWarpage that was never in the simulation, and a cavity that wears faster than the life estimate
Flame-retardant grade and test thicknessWhich UL listing actually appliesA V-0 claim measured at a thickness your part does not have
Regrind ratio, in writingHow much process scrap re-enters the feedParts that pass the first article and fail at 60% of the order, because the regrind fraction drifted
Drying specification and dryer dew pointWhether moisture-sensitive resin was processed dryHydrolysis in PA, PC and PBT: parts that are brittle, streaked or weak at the gate, with nothing visible on the outside

The regrind line is the one buyers most often leave out, and it is the one that quietly changes a validated process. Regrind is not automatically bad — most commodity molding uses some, within a stated limit, and the parts are fine. What is unacceptable is an unstated and variable ratio, because then the material in month six is not the material that was approved in month one, and no certificate will tell you so.

Three clear containers of plastic resin pellets in natural, black and glass-filled beige on a stainless bench, with a desiccant drying hopper behind
Three grades, three behaviors. The beige pellets carry short glass fiber, which is why that part will shrink differently along the flow than across it — a property of the grade, not of the machine.

T0 and T1: Agree the Vocabulary Before You Need It

Sampling is where a project is won or lost, and it is also where the words are least standardized. T0, T1 and T2 mean different things at different suppliers; some use T0 for the first trial in the toolmaker's press and T1 for the first submission, others reverse them. If the purchase order does not define the gates, both sides will believe they agreed.

GateWhat should exist at that pointWho signs
Tool design approvalTool layout, cavity count, gate and runner scheme, cooling, ejection, sliders, steel specificationCustomer engineering, before steel is ordered
First trial (T0)Parts exist; the tool opens and closes; the process window is roughly foundSupplier internally — this is a debug run, not a submission
Sample submission (T1)Parts from every cavity, with material lot, process sheet and a dimensional report against the drawingSupplier submits, customer measures
Correction and re-submissionTool changes documented, parts re-measured, deviations listed with a disposition proposalBoth, with a change record
Golden sampleSigned parts, sealed and dated, that define the accepted appearance and fitCustomer quality; kept by both parties
Production releaseFrozen process sheet, inspection plan, packaging specificationCustomer, before the first production order

Two rules make that chain work. Every cavity, every time: a four-cavity tool sampled with one part proves one cavity. Cavity-to-cavity variation is normal and small, but it is also where a hot-runner imbalance or a cooling difference hides, and it will not appear until the order is running. The report is measured, not asserted: a T1 package that says "dimensions: OK" without numbers is a submission without evidence.

It is also worth deciding in advance what happens to a sample that is 80% right. Real projects almost never produce a perfect first submission; they produce a part with three dimensions out and one cosmetic issue, and the useful question is whether the fix is a tool change, a process change, or an acceptance with a deviation. A supplier who arrives at that meeting with a proposal is a supplier who has done this before.

Eight identical off-white molded parts laid out on a granite surface plate with a dial indicator contacting one part on a V-block and a height gauge beside the plate
Eight parts from one submission, not one. The set is what shows whether the tool is stable across cavities and across the run, and it is the only version of "the sample was fine" that can be checked later.

Plastic Tolerances: Why Metal Habits Fail

A drawing toleranced like a machined part will produce a tooling quotation that looks expensive and a part that still fails. Molded plastic does not hold size the way metal does, for reasons that are all predictable and none of which are the machine's fault.

What moves the dimensionHow it shows upWho controls it
Mold shrinkageEvery dimension smaller than the cavity by 0.4–2%, depending on resin and wallThe tool: shrink is compensated once, in the cavity steel
Fiber orientationDifferent shrink along the flow and across it, so a glass-filled part is not isotropicThe gate position and the part design, decided before steel
Post-molding shrinkageDimensions continue to change for hours to days after ejection, especially in PA and POMThe measurement timing — and the drawing, if it says when to measure
Moisture uptakePA parts grow measurably in humid storage, then shrink again when driedThe material choice and the packaging
WarpageFlatness and straightness deviate without any dimension being "wrong"Cooling design, wall uniformity, packing pressure
Parting-line mismatchFeatures on opposite halves are offset by the tool's alignment, not by the moldingTool construction; visible only on features that cross the line

The practical approach is to accept three things at once. General tolerances cover most of the drawing, because most dimensions are not functional. A short list of dimensions carries a direct tolerance, because they locate, seal, snap or assemble. And the drawing says when to measure, because a part measured hot and a part measured after 48 hours are two different parts, and both can be "correct".

For the general case, ISO 20457 is the standard that addresses tolerances and acceptance conditions for molded plastic parts, and it is the reference a European drawing is most likely to cite. If your drawing cites it, the useful thing to check is whether it names a tolerance grade and which dimensions are exempt — a standard invoked without a grade is a standard that will be interpreted twice.

A guide, not a guarantee. On a stable tool with a well-behaved resin, a functional dimension on a small part can hold a few hundredths of a millimeter, and buyers routinely specify that. On a large, thin-walled or glass-filled part, the same number is a request for a tool correction loop that may never converge. The tolerance should be written against what the feature does, and confirmed at T1 with real measurements rather than assumed from a table.

Batch Consistency: What Actually Drifts Between Month One and Month Six

The first article is a snapshot. Production is a trend, and four things cause it to move. Each has a cheap detector, and none of the detectors is a final inspection.

What driftsHow it shows upWhat detects it early
Resin lotShade shift, slightly different flow, small dimensional movementCertificate of analysis per lot, compared against the approved lot
Regrind ratioFalling impact strength and rising short-shot rate, with no visible causeA stated ratio in the process sheet, and part weight tracking
Tool wearFlash at the parting line, sharper edges rounding, gate area erodingPeriodic mold inspection at a shot interval, plus the maintenance log
Process settingsCycle time creeping up, or a technician "optimizing" a validated parameterA frozen process sheet, and a parameter check at each production start

Of those detectors, the cheapest and most underused is part weight. A molded part's weight is a direct function of the amount of material in the cavity, so a 0.5% shift tells you that something in the material or the process has changed before any dimension has moved out of tolerance. It costs a balance and a few seconds per shift, and it catches the class of drift that dimensional inspection is too slow and too sparse to see.

The second cheapest is the frozen process sheet: the record of injection speed, packing pressure and time, melt temperature, mold temperature and cooling time that was validated at T1. Without it, "the same settings" means whatever the operator on shift believes, and a machine that has been re-set for another job will not return to the validated window by itself.

Quality Documents: What They Prove and What They Do Not

A quality document is evidence of a specific check at a specific time. It is not a statement about the whole order, and the fastest way to lose trust with an OEM quality department is to send a certificate as if it were one.

DocumentWhat it provesWhat it does not prove
First article inspection reportThat the first parts of a revision were measured against every drawing characteristicThat later parts were — unless sampling is defined
Dimensional reportThat the listed characteristics were measured, on the stated sample, at the stated timeThat unlisted characteristics are in tolerance
Cavity-by-cavity reportThat every cavity was measured, not just oneLong-term balance between cavities as the tool wears
Material certificate of analysisThe grade and lot as delivered by the resin makerWhat happened on the shop floor: drying, regrind, masterbatch
Process sheetThe validated parameter window for the approved tool and materialThat the current run used it, without a check
SPC dataThat a characteristic was tracked over time and stayed in controlAnything about characteristics that were not charted
PPAP packageA full production-part approval structure, when the customer requires itThat the supplier is automotive-certified — a PPAP can be produced outside IATF
Tool maintenance logThat the tool was serviced, when, and what was changedThat the service was effective — that needs a post-service sample

On certification, the boundary is worth stating plainly, because this is where marketing language and audit language diverge. Our quality management system is ISO 9001:2015, with project-level controls applied per order: drawing revision control, material and lot traceability, first article inspection, dimensional reporting and nonconformance handling. We do not hold an ISO 13485 certificate and we do not hold an IATF 16949 certificate. Where a medical or automotive program requires those, the requirement has to be resolved at supplier approval — either by a partner in the chain who holds them, or by a different supplier — not by writing them into a page or a quotation.

Total Sourcing Cost: Why the Mold Price Is the Least Useful Number

Two quotations for the same part can differ by 30% on tooling and still reverse order once the tool is running. The reason is that the mold is a small fraction of what a program costs, and the part price is a function of cycle time, scrap and tool life — three things a cheap tool is designed to be bad at.

Cost lineWhat drives itHow it hides
Tool design and buildCavity count, steel, sliders, hot runner, texture, tolerance demandQuoted as one number; the steel grade and the cavity count are where it varies
Sampling and correctionHow many loops the tool needs, and who pays for themOften excluded from the tool price and billed later as "modifications"
Part priceCycle time, cavities, resin, machine rate, scrap allowanceA low part price with a long cycle is a machine-hour subsidy you pay for later
Cycle timeWall thickness, cooling design, gate, ejectionTwo seconds on a 30-second cycle is about 55 hours of machine time per 100,000 parts
Scrap and reworkProcess capability, cosmetic standard, assembly yieldStated as a percentage; rarely stated as who pays for it
Secondary operationsPrinting, plating, ultrasonic welding, assembly, packingQuoted separately, so the total is only visible when you add it up yourself
InspectionWhich characteristics are reported, and how oftenFree in the quote, absent in the shipment
Freight, duty, clearanceVolume, packaging density, Incoterms, destinationExcluded from the part price and larger than expected on bulky parts
Tool maintenance and replacementShot volume against tool life, and the maintenance regimeInvisible until year three, when the second tool is needed

This is the argument for comparing on total cost of ownership rather than on unit price, but it only works if the comparison is made on the same assumptions. Before you compare three quotations, write down the five numbers that must be identical across them: cavity count, steel grade, resin grade, annual volume, and the inspection scope. If any of those differ, the prices are not comparable and the lowest one is probably measuring a smaller scope.

Engineering Change Control: What Has to Be Notified

A validated part is a set of conditions that happened to produce good parts. Change one condition and the validation no longer describes what is being shipped. The useful question for a buyer is not whether the supplier has a change procedure, but which changes trigger it.

ChangeWhy it mattersWhat should happen before it is implemented
Resin grade or manufacturerShrinkage, flow and color all moveWritten notice, customer approval, re-sampling with dimensional report
Regrind ratioMechanical properties and color shiftDeclared ratio held in the process sheet; changes notified
Machine or siteThe process was developed on a specific machineNotification, trial run, comparison against the golden sample
Process parametersThe validated window is the evidence of capabilityFrozen sheet; any deviation re-validated, not adjusted on the floor
Tool modificationEvery cut in steel is a permanent change to the partApproval before cutting, change record, re-measurement after
SubcontractorAdds a party you have not qualifiedDeclaration and, for critical steps, approval
Drawing revisionMost fitment failures are a correct part made to an old revisionRevision on the traveller, checked at first-off, recorded

Two of these are worth negotiating into the contract rather than assuming. Subcontracting is the one that most often appears after the fact: plating, printing and assembly are commonly outsourced, and occasionally molding itself is, in a busy quarter. Tool modification is the one with the longest memory: a cavity welded and re-cut is not the tool that was validated, and if nobody wrote it down, the dimensional history becomes unreadable.

Supplier Audit Checklist: Ten Questions and the Evidence That Answers Them

This is the page's working asset. Each row is a question an OEM buyer can ask on a call or in an audit, the evidence that answers it, and the reason the evidence matters. None of them require a factory visit to start; all of them are worth a visit to confirm.

DimensionCore questionEvidence to requestWhy it matters
Factory identityWho is the legal entity, and where is the part actually made?Business license, certificate with site address and scope, walk-round video showing the machinesDetermines who answers if something goes wrong, and whether the audit describes the real site
Tooling ownershipWho owns the mold, and who may move it?Tool clause in the PO, tool number in the asset register, transfer procedureA tool you cannot move is a tool you do not control, whatever the invoice says
EngineeringCan they review the design before steel, and did they?A real DFM report with named features and change proposalsEvery change after the tool is cut costs an order of magnitude more
Resin controlWhich grade, from which maker, dried how?Grade code, certificate of analysis per lot, dryer specification, regrind ratioFamily-level material promises hide the variable that breaks a validated process
SamplingWhat does a T1 submission contain, and who approves it?Defined gates in the PO, cavity-by-cavity parts, dimensional report, golden sampleThe vocabulary varies by supplier; only the written definition is shared
TolerancesWhich dimensions are functional, and how were they set?Drawing with a short critical list, measurement timing, T1 measured resultsMolded plastic cannot hold a metal-style tolerance across every dimension
Process controlIs there a frozen process sheet, and is it used?Parameter sheet, part weight trend, parameter check at production startConsistency is a record before it is a promise
Quality systemWhat is certified, for which site, and what is project-specific?Certificate with scope, inspection plan, nonconformance procedure, sample reportsCertificates describe a system; reports describe your parts
CapacityCan they take the volume in the month you need it?Machine list with tonnage and status, molding schedule, current load estimateA capability that is already committed to another customer is not capacity
Change controlWhat triggers a notification, and who approves it?Written change procedure, subcontracting declaration, revision control on the travellerThe third year is where undocumented change becomes visible

Read the table as a sequence rather than a checklist. Identity and ownership are settled before the order; engineering before steel; resin, sampling and tolerance at T1; process control, quality documents and change control across production; capacity whenever the forecast moves. A supplier who can answer the first three well is usually worth the effort of the last seven.

What to Put in an Injection Molding RFQ

Most slow quotations are not the supplier's fault. A drawing without a material, a volume and a cosmetic standard cannot be priced, so the supplier either asks four questions or guesses — and a guess is what you will be comparing against another guess.

ItemWhat it should contain
3D model and 2D drawingSTEP at a named revision, plus a drawing with tolerances, datums and the critical characteristics marked
MaterialGrade code and maker where specified; otherwise the performance requirement, so the grade can be proposed and agreed
Annual volume and call-offAnnual quantity, typical order size, and whether the volume is firm or forecast
Cavity expectationWhether the tool should be single-cavity for simplicity or multi-cavity to hit a unit price
Cosmetic standardWhich surfaces are visible, what texture, and which defects are unacceptable — ideally with a photo or a sample
Critical dimensionsThe short list that decides fit and function, with tolerances; the rest can stay general
ColorPantone or RAL reference, masterbatch expectation, and whether a color chip must be approved first
Application conditionsTemperature, chemicals, UV, load, and whether the part is a safety or sealing element
Tool ownershipWho owns the tool, whether it must be transferable, and whether tool drawings are a deliverable
Inspection requirementWhether you need FAI, dimensional report, cavity report, material certificate, SPC or PPAP
Secondary operationsPrinting, plating, welding, assembly, and whether they are in scope or bought separately
Delivery termsIncoterm, destination, packaging specification, and whether parts ship in bulk or kitted

Two of those items change the answer more than the rest. Cavity expectation sets the tool cost and the unit price against each other, and a supplier cannot optimize both without knowing which one you are buying. Tool ownership decides whether the quotation is for a tool or for a capability, and it is the line that most often gets agreed verbally and forgotten in the PO.

Where Our Scope Starts and Stops

This page is written from the buyer's side, so it would be inconsistent to close it with a claim we cannot evidence. What follows is the honest version.

We doWe do not
Design and build injection molds, and run production on themClaim a certified medical or automotive quality system we do not hold
Review a part before steel, and say what we would changeOwn the product design, the risk assessment or the regulatory file
Machine to a specified resin grade, and supply the lot certificate we receiveGuarantee a material's performance in your application — that is a design and test question
Submit T1 samples from every cavity with a measured reportApprove our own samples on your behalf
Hold a client's tool, maintain it and transfer it on instructionPromise a tool life in shots without stating the steel, the resin and the maintenance regime behind it
Apply ISO 9001:2015 controls and project-specific documentation per orderPresent ISO 9001 as if it were ISO 13485 or IATF 16949

That last row is the one worth repeating to a colleague. ISO 9001 says a process is defined and followed; ISO 13485 and IATF 16949 add sector-specific requirements that a general molder does not automatically meet. If your program needs them, ask for the certificate and read the scope — and if it does not exist, that is a planning input, not a negotiating position.

Coordinate measuring machine with a ruby-tipped stylus inside the cavity of a black molded plastic housing held on a fixture, with a second housing showing its ribbed underside
A housing measured in the cavity, not just at the outline: the features that decide whether it assembles are the ones inside it, and they are the ones a report should name.

Frequently Asked Questions

How do I know whether a Chinese injection molding supplier is a real factory?
Ask for three things and compare them: the legal name and address on the business license, the site address and scope printed on the quality certificate, and a walk-round video that shows the machines with a mold mounted. The license proves the entity, the certificate proves which site was audited and whether molding is inside its scope, and the video proves the machines exist at that site. None of the three proves capacity available to you, which is a separate question about the molding schedule.
Who owns the injection mold when I source from China?
Whoever the contract says, which is why the sentence has to be specific. Ownership is really six rights: title to the physical tool, custody and identification, the right to use it exclusively, responsibility for maintenance, the right to transfer it, and ownership of the tool drawings and data. Many quotations state only the first and leave the rest to be discovered later. Ask for the tool number, the maintenance interval in shots, the transfer procedure and the drawing package as deliverables of the first project.
What is the difference between T0 and T1 samples?
In most projects T0 is the first trial inside the toolmaker's own press, where the goal is to make the tool open, close and fill, and T1 is the formal submission of samples for the customer's measurement and approval. But the terms are not standardized, and some suppliers use them the other way round. The only reliable fix is to define each gate in the purchase order, with what is delivered at each one and who signs it, before the tool is cut.
How many parts should a T1 sample submission contain?
At minimum, parts from every cavity, plus enough parts from one cavity to show the process is stable rather than lucky. A four-cavity tool submitted with one part proves one cavity; cavity-to-cavity variation is usually small, but it is exactly where a hot-runner imbalance or a cooling difference hides, and it will not appear until the order is running. The submission should also carry the material lot, the process sheet and a measured dimensional report.
How do I verify the plastic resin grade a supplier actually used?
Ask for the resin maker and the exact grade code on the quotation, and for a certificate of analysis for each lot delivered. The certificate gives melt flow, density and filler content as received, which is the only way to separate a material problem from a process problem when a batch misbehaves. Two further variables belong in writing: the masterbatch carrier and let-down ratio, and the regrind ratio — an unstated and drifting regrind percentage is the most common reason a validated process quietly stops producing the approved part.
Can molded plastic parts hold the same tolerances as machined metal parts?
No, and the difference is structural rather than a matter of skill. Molded dimensions are set by shrinkage, which depends on the resin, the wall, the gate position and the fiber orientation, and they keep changing for hours or days after ejection. The workable approach is to leave general tolerances on the drawing, put direct tolerances on the few dimensions that locate, seal or assemble, and state when the part is measured. ISO 20457 is the standard that addresses tolerances and acceptance conditions for molded parts, and if your drawing cites it, check that it names a grade.
How can I tell if a supplier's DFM review is real?
A real review names features. It will point at a specific wall, boss, undercut, gate or parting line, say what will happen to it, and propose a change with an idea of what the change costs — before steel is cut. A review that says the part looks manufacturable without naming anything is a formality. Two things worth checking specifically: whether the draft allowance accounts for the texture depth, since textured walls need more draft than polished ones, and where the weld lines will land, since they can be moved but not removed.
What quality documents should I expect from a Chinese molder?
For a normal project: a first article inspection report, a dimensional report against the drawing, a material certificate of analysis per lot, and a process sheet for the validated settings. For a multi-cavity tool, a cavity-by-cavity report. SPC data and a PPAP package are reasonable when the program requires them, and both should be named at quotation rather than requested afterwards. What none of these documents prove is that unlisted characteristics are in tolerance, or that the current run used the validated settings.
Is ISO 9001 enough for a medical or automotive molding project?
Usually not on its own. ISO 9001 says a process is defined and followed; ISO 13485 adds medical-device specific requirements, and IATF 16949 adds automotive ones, and neither follows automatically from the first. If your program requires them, ask for the certificate and read the entity, the site and the scope line. Where a supplier does not hold the certificate, that is a planning decision for your approved-supplier list — it cannot be replaced by a statement on a website or in a quotation.
How do I compare injection molding quotations from China fairly?
Fix five variables before you compare: cavity count, steel grade, resin grade, annual volume, and inspection scope. If any of those differ, the prices are not measuring the same job. Then compare on total cost — tool, sampling loops, part price, cycle time, scrap, secondary operations, inspection, freight and tool maintenance — rather than on the tool price alone. A cheaper tool with a longer cycle and half the life is not cheaper; it is a different schedule of replacement.
What happens to my mold if I stop ordering?
It depends entirely on what was agreed, which is why custody matters as much as title. The usual arrangement is that the tool stays in the supplier's rack, is identified by a tool number, is maintained on an agreed interval and is returned or transferred on written instruction, at the customer's cost. What is worth deciding early is the condition report at handover and whether the process sheet and tool drawings go with it — a tool without its process history takes months to re-qualify at the next molder.
Can I start with a prototype tool and move to a production tool later?
Yes, and on many projects that is the sensible route: a prototype tool gets parts and market feedback quickly, and the production tool is cut later with the design settled. Two things make the transition work. The prototype tool should be built to the same part geometry as the intended production part, so the samples are meaningful. And the decision about cavity count should be taken with the annual volume in hand, because the unit price difference between a single-cavity and a multi-cavity tool is usually larger than the tool price difference.

Send the Part, the Volume and the Standard You Will Judge It By

Share the 3D model and drawing at a named revision, the resin grade or the performance requirement, the annual volume and call-off pattern, the surfaces that are visible, and the inspection documents your quality team will ask for. The review covers the tool concept, the DFM changes worth making before steel, the sampling gates and what a T1 submission will contain — and anything that cannot be molded as drawn is raised before the quotation rather than at the first trial.

Request an OEM Molding Quote

STEP, IGES, X_T, DXF, DWG or PDF · prototype tooling through production molds

See our injection molding capabilities →

Services

Custom injection molding services — process families, capability matrix and production workflow.

Tooling

Custom plastic injection mold — mold types, steel selection, T0/T1 and mold life.

Medical

Medical plastic injection molding — how medical projects are controlled and documented.

Technical

Thin-wall injection molding — what changes when the wall goes below one millimeter.

Components

Custom plastic components — the wider plastics scope across processes.

Quality

Quality and certifications — what our system covers, and what it does not.

Recommended Reading