How to Evaluate a China Plastic Injection Molding Supplier
When you place a molding project in China you buy three things at once: a mold you do not yet own, a process window you cannot see, and a paper trail that decides whether either of the first two can be verified later. Price is the worst of the three to compare first, because it is the only one that is quoted plainly.
At a Glance
The first question is not what a Chinese injection molding supplier can make, but who it is. Establish the legal entity, the production address and whether the machines belong to that entity; ask who owns the mold, who stores it and who may move it; ask for the resin grade rather than the resin family, with a certificate of analysis per lot; agree what T0 and T1 mean in the purchase order before the tool is cut; assign tolerances to the few dimensions that function and leave the rest general; and compare quotations on mold life, cycle time, scrap and tool maintenance rather than on the mold price alone. A supplier that can answer those six things in documents is usually a supplier that can also make the part. Everything on this page is written from the buyer's side of that conversation, including the part where we describe what we can and cannot evidence ourselves.
Who This Page Is For, and What It Deliberately Does Not Cover
This is a procurement guide, not a capability brochure. It is written for the person who has to sign the purchase order: an OEM buyer comparing three quotations, a product engineer who has to accept a T1 sample, or a supplier quality engineer who has been asked to approve a factory they have never visited.
| This page covers | Where that detail lives instead |
|---|---|
| How to tell a manufacturer from a trader, and why the distinction changes the contract | — |
| Mold ownership, custody, maintenance and transfer as separate rights | The tooling process itself is on the custom injection mold page |
| What a DFM report has to contain before steel is cut | Process families, machine range and capability tables are on the injection molding services page |
| How to verify resin grade, lot and masterbatch | Material property comparisons sit with the service pages |
| How to define sampling gates and approve a T1 | T0/T1/T2 as process stages are described on the mold page |
| How to compare total sourcing cost and manage engineering changes | — |
What it does not do is re-teach injection molding. If you need the process explained, the service page does that better, and repeating it here would only make both pages weaker. What follows assumes you already have a part, a drawing, and a shortlist.
Four Supplier Types, and What Each One Actually Sells You
Almost every disappointment in Chinese molding sourcing traces back to a mismatch between the type of supplier that was chosen and the type of responsibility that was needed. The four types below are not a quality ranking. They are four different commercial structures, and each one leaves a different gap for you to fill.
| Type | What you are actually buying | Where responsibility sits | The gap you have to close |
|---|---|---|---|
| Integrated manufacturer | Tool design, tool making and molding under one roof and one legal entity | One counterparty for tool and part; internal escalation when a sample fails | You still have to verify the scope honestly — an integrated supplier can also buy tools out in a busy quarter |
| Injection molder | Machine time and process knowledge; the tool is bought elsewhere | Split: the toolmaker owns tool defects, the molder owns part defects | Two contracts and an argument waiting to happen when a defect could be either |
| Toolmaker | A mold, sometimes with first samples; no production capacity | Tool quality only | You must qualify a second supplier to run the tool, and the tool must be proven on that machine |
| Trading company or sourcing agent | Coordination, documentation and price aggregation | Contractually with the trader; physically with an unnamed factory | Visibility: you may never see the machines that make your part, and changes pass through a third party |
The practical test is not "are you a factory" — everyone says yes — but "which entity would answer a recall notice". A trader can be a perfectly good partner for a commodity part with a stable design; it is a poor fit for a part whose tool you are paying for and whose process window you will need to reproduce in three years.
Factory Identity: Whose Machines, at Which Address, Under Which Entity
The single most common sourcing surprise is not bad quality. It is discovering, after the tool is built, that the entity on the invoice is not the entity on the certificate, and neither of them is at the address where the parts are made. None of that is necessarily fraud; it is a normal consequence of how Chinese manufacturing groups are organized. It is still something you want to know on day one rather than in year three.
| What to ask for | What it actually proves | What it does not prove |
|---|---|---|
| Business license with the registered address | The legal entity exists and what it is allowed to do | That production happens there, or that the entity owns the machines |
| Quality certificate with the site address and scope | Which site was audited, and whether molding is inside the certified scope | That your specific part runs on that site — check the scope wording, not the logo |
| Machine nameplates and a walk-round video with the mold mounted | That the machines exist, at that site, in that configuration | Capacity available to you, or whether the tool in the video is yours |
| Utility or property documents for the site | That the site is operated by the entity, not borrowed for a visit | Anything about quality |
| Subcontracting declaration | Which steps leave the site: plating, printing, assembly, sometimes molding | That the declaration is complete — it is a statement, and it belongs in the contract |
Three questions settle most of this in a ten-minute call. First: what is the exact legal name and address that will appear on the commercial invoice, and does the quality certificate name the same entity? Second: which production steps happen inside that address, and which are subcontracted? Third: if we audit, who will be standing in the room — the trading entity, the factory, or both?
The certificate question deserves its own sentence, because it is where buyers most often over-read a document. A certificate covers a scope and a site. A group holding ISO 9001 at one plant does not thereby hold it at a second plant; a certificate issued to a trading company does not certify the factory behind it. Reading the address and the scope line is a two-minute job that prevents a two-year assumption.
Mold Ownership Is Six Rights, Not One Sentence
"Customer-owned mold" is a phrase that appears in almost every Chinese tooling quotation and settles almost nothing. Ownership is a bundle of separable rights, and in a dispute the parties discover that they agreed on one of them and assumed the other five.
| Right | The question it answers | What to put in writing |
|---|---|---|
| Title | Who owns the physical tool, and does the tooling charge buy it outright or amortise it into part price? | An explicit statement that title passes on payment, naming the tool by its identification number |
| Custody | Where is the mold stored, and how is it identified among hundreds of others? | A unique tool number on the mold, in the supplier's asset register, and on your purchase order |
| Use | May the tool run for anyone else, or produce parts outside your orders? | An exclusivity clause, or a written statement that it does not — silence is not exclusivity |
| Maintenance | Who cleans, inspects and repairs it, at what interval, and who pays for wear versus damage? | A maintenance interval in shots, a log you can request, and a split between normal wear and negligence |
| Transfer | Can you move it, in what condition, at whose cost, and with what documentation? | A transfer procedure, a condition report at handover, and the packaging and freight responsibility |
| Data | Who owns the mold drawings, the 3D tool model, the electrode and CAM files, and the steel certificates? | An IP clause that lists the files, not just "the design" |
The transfer right is the one that is most often assumed and least often tested. A tool that can physically be moved is not necessarily a tool that can be run elsewhere: if the process was developed on one machine, if the hot-runner controller is proprietary to the supplier, or if no process sheet exists, the next molder starts from zero and your transfer takes months instead of weeks. The cheap insurance is to require a process sheet and a tool drawing pack as deliverables of the first project, not as a favor at the end.
Mold life is the number everyone quotes and nobody defines. "500,000 shots" is a projection based on a steel grade, a surface finish, a resin and a maintenance regime — change any one and the number moves. Ask what the life estimate assumes: which steel, whether the cavity is textured, whether the resin is abrasive or glass-filled, and what maintenance interval is included. A tool quoted at a lower price with half the life is not cheaper; it is a different schedule of replacement.
Engineering Capability: What a DFM Report Has to Contain
Design for manufacturability is the cheapest stage of a molding project and the one most often reduced to an email saying "the part looks fine". The test of an engineering review is not whether it exists, but whether it names the features it would change and the cost of not changing them.
| What the report should address | What it looks like when it is done properly | What it prevents |
|---|---|---|
| Wall thickness | A thickness map against the nominal, with the areas above and below flagged | Sink marks on the visible face, and short shots at the far end of the flow path |
| Draft and texture | Draft per surface, with texture depth converted into additional draft | Scuffing and ejection marks on a textured wall that had metal-safe draft but not texture-safe draft |
| Ribs and bosses | Rib thickness relative to the wall, boss wall relative to nominal, and gusset or coring proposals | Sink over every boss, and cracking at the boss root after assembly |
| Undercuts | A list of every feature that cannot release in the draw direction, with slider, lifter or redesign options | A tool that needs two extra actions and a later, expensive modification |
| Gate location | Proposed gate with the fill pattern and the resulting weld-line positions marked | Weld lines across a cosmetic face, or a gate scar where the customer will see it |
| Cooling | Channel layout and the expected temperature difference across the part | Warpage and cycle time that nobody can explain after the tool is cut |
| Ejection | Ejector positions on a surface that can take a mark, with the expected force | White marks on a visible face, and parts that stick on the core |
| Parting line | The chosen line, and what it does to appearance and to the shut-off faces | Flash on a visible edge, and a parting line that crosses a sealing surface |
| Shrinkage and warpage | The shrink allowance per direction, with the material and fiber orientation behind it | Parts that are dimensionally right in the tool and wrong after 24 hours |
Two of those deserve a note because they are the ones buyers most often discover too late.
Texture costs draft. A textured wall needs more draft than a polished one, because the texture is a series of microscopic undercuts. The rule of thumb used in toolmaking is roughly one additional degree of draft for every 0.025 mm of texture depth, and a heavy grain on a deep wall can need several degrees. A part designed with one degree of draft everywhere will mold cleanly in a polished tool and scuff in a textured one — and the drawing rarely says which.
Weld lines cannot be deleted, only moved. Where two flow fronts meet, the material has already cooled and the joint is weaker and visually different. A good DFM report says where they will land; a bad one lets them land on the face the customer photographs. If a weld line is structurally critical — a pressurized housing, a living hinge — moving it is a design change, not a process tweak, and it belongs in the review.
Resin Verification: A Grade Is Not a Family
"ABS" on a quotation tells you almost nothing. ABS covers a range of impact strengths, flow rates and surface qualities that differ by a factor of two or more between grades, and the difference shows up in a drop test, a paint adhesion test or a color match long after the parts have shipped.
| What to require | What it proves | What happens without it |
|---|---|---|
| Resin manufacturer and exact grade code | Which material the process was set up for | A substitute grade with the same family name and different shrinkage, and a tool that no longer holds tolerance |
| Certificate of analysis for the lot | Melt flow, density and filler content as delivered, not as advertised | No way to separate a material problem from a process problem when a batch fails |
| Masterbatch carrier and let-down ratio | Whether the color concentrate is compatible with the base resin | Color streaks, and a drop in mechanical properties where the carrier does not bond |
| Glass fiber content and grade | The shrinkage anisotropy and the wear rate on the tool | Warpage that was never in the simulation, and a cavity that wears faster than the life estimate |
| Flame-retardant grade and test thickness | Which UL listing actually applies | A V-0 claim measured at a thickness your part does not have |
| Regrind ratio, in writing | How much process scrap re-enters the feed | Parts that pass the first article and fail at 60% of the order, because the regrind fraction drifted |
| Drying specification and dryer dew point | Whether moisture-sensitive resin was processed dry | Hydrolysis in PA, PC and PBT: parts that are brittle, streaked or weak at the gate, with nothing visible on the outside |
The regrind line is the one buyers most often leave out, and it is the one that quietly changes a validated process. Regrind is not automatically bad — most commodity molding uses some, within a stated limit, and the parts are fine. What is unacceptable is an unstated and variable ratio, because then the material in month six is not the material that was approved in month one, and no certificate will tell you so.
T0 and T1: Agree the Vocabulary Before You Need It
Sampling is where a project is won or lost, and it is also where the words are least standardized. T0, T1 and T2 mean different things at different suppliers; some use T0 for the first trial in the toolmaker's press and T1 for the first submission, others reverse them. If the purchase order does not define the gates, both sides will believe they agreed.
| Gate | What should exist at that point | Who signs |
|---|---|---|
| Tool design approval | Tool layout, cavity count, gate and runner scheme, cooling, ejection, sliders, steel specification | Customer engineering, before steel is ordered |
| First trial (T0) | Parts exist; the tool opens and closes; the process window is roughly found | Supplier internally — this is a debug run, not a submission |
| Sample submission (T1) | Parts from every cavity, with material lot, process sheet and a dimensional report against the drawing | Supplier submits, customer measures |
| Correction and re-submission | Tool changes documented, parts re-measured, deviations listed with a disposition proposal | Both, with a change record |
| Golden sample | Signed parts, sealed and dated, that define the accepted appearance and fit | Customer quality; kept by both parties |
| Production release | Frozen process sheet, inspection plan, packaging specification | Customer, before the first production order |
Two rules make that chain work. Every cavity, every time: a four-cavity tool sampled with one part proves one cavity. Cavity-to-cavity variation is normal and small, but it is also where a hot-runner imbalance or a cooling difference hides, and it will not appear until the order is running. The report is measured, not asserted: a T1 package that says "dimensions: OK" without numbers is a submission without evidence.
It is also worth deciding in advance what happens to a sample that is 80% right. Real projects almost never produce a perfect first submission; they produce a part with three dimensions out and one cosmetic issue, and the useful question is whether the fix is a tool change, a process change, or an acceptance with a deviation. A supplier who arrives at that meeting with a proposal is a supplier who has done this before.
Plastic Tolerances: Why Metal Habits Fail
A drawing toleranced like a machined part will produce a tooling quotation that looks expensive and a part that still fails. Molded plastic does not hold size the way metal does, for reasons that are all predictable and none of which are the machine's fault.
| What moves the dimension | How it shows up | Who controls it |
|---|---|---|
| Mold shrinkage | Every dimension smaller than the cavity by 0.4–2%, depending on resin and wall | The tool: shrink is compensated once, in the cavity steel |
| Fiber orientation | Different shrink along the flow and across it, so a glass-filled part is not isotropic | The gate position and the part design, decided before steel |
| Post-molding shrinkage | Dimensions continue to change for hours to days after ejection, especially in PA and POM | The measurement timing — and the drawing, if it says when to measure |
| Moisture uptake | PA parts grow measurably in humid storage, then shrink again when dried | The material choice and the packaging |
| Warpage | Flatness and straightness deviate without any dimension being "wrong" | Cooling design, wall uniformity, packing pressure |
| Parting-line mismatch | Features on opposite halves are offset by the tool's alignment, not by the molding | Tool construction; visible only on features that cross the line |
The practical approach is to accept three things at once. General tolerances cover most of the drawing, because most dimensions are not functional. A short list of dimensions carries a direct tolerance, because they locate, seal, snap or assemble. And the drawing says when to measure, because a part measured hot and a part measured after 48 hours are two different parts, and both can be "correct".
For the general case, ISO 20457 is the standard that addresses tolerances and acceptance conditions for molded plastic parts, and it is the reference a European drawing is most likely to cite. If your drawing cites it, the useful thing to check is whether it names a tolerance grade and which dimensions are exempt — a standard invoked without a grade is a standard that will be interpreted twice.
Batch Consistency: What Actually Drifts Between Month One and Month Six
The first article is a snapshot. Production is a trend, and four things cause it to move. Each has a cheap detector, and none of the detectors is a final inspection.
| What drifts | How it shows up | What detects it early |
|---|---|---|
| Resin lot | Shade shift, slightly different flow, small dimensional movement | Certificate of analysis per lot, compared against the approved lot |
| Regrind ratio | Falling impact strength and rising short-shot rate, with no visible cause | A stated ratio in the process sheet, and part weight tracking |
| Tool wear | Flash at the parting line, sharper edges rounding, gate area eroding | Periodic mold inspection at a shot interval, plus the maintenance log |
| Process settings | Cycle time creeping up, or a technician "optimizing" a validated parameter | A frozen process sheet, and a parameter check at each production start |
Of those detectors, the cheapest and most underused is part weight. A molded part's weight is a direct function of the amount of material in the cavity, so a 0.5% shift tells you that something in the material or the process has changed before any dimension has moved out of tolerance. It costs a balance and a few seconds per shift, and it catches the class of drift that dimensional inspection is too slow and too sparse to see.
The second cheapest is the frozen process sheet: the record of injection speed, packing pressure and time, melt temperature, mold temperature and cooling time that was validated at T1. Without it, "the same settings" means whatever the operator on shift believes, and a machine that has been re-set for another job will not return to the validated window by itself.
Quality Documents: What They Prove and What They Do Not
A quality document is evidence of a specific check at a specific time. It is not a statement about the whole order, and the fastest way to lose trust with an OEM quality department is to send a certificate as if it were one.
| Document | What it proves | What it does not prove |
|---|---|---|
| First article inspection report | That the first parts of a revision were measured against every drawing characteristic | That later parts were — unless sampling is defined |
| Dimensional report | That the listed characteristics were measured, on the stated sample, at the stated time | That unlisted characteristics are in tolerance |
| Cavity-by-cavity report | That every cavity was measured, not just one | Long-term balance between cavities as the tool wears |
| Material certificate of analysis | The grade and lot as delivered by the resin maker | What happened on the shop floor: drying, regrind, masterbatch |
| Process sheet | The validated parameter window for the approved tool and material | That the current run used it, without a check |
| SPC data | That a characteristic was tracked over time and stayed in control | Anything about characteristics that were not charted |
| PPAP package | A full production-part approval structure, when the customer requires it | That the supplier is automotive-certified — a PPAP can be produced outside IATF |
| Tool maintenance log | That the tool was serviced, when, and what was changed | That the service was effective — that needs a post-service sample |
On certification, the boundary is worth stating plainly, because this is where marketing language and audit language diverge. Our quality management system is ISO 9001:2015, with project-level controls applied per order: drawing revision control, material and lot traceability, first article inspection, dimensional reporting and nonconformance handling. We do not hold an ISO 13485 certificate and we do not hold an IATF 16949 certificate. Where a medical or automotive program requires those, the requirement has to be resolved at supplier approval — either by a partner in the chain who holds them, or by a different supplier — not by writing them into a page or a quotation.
Total Sourcing Cost: Why the Mold Price Is the Least Useful Number
Two quotations for the same part can differ by 30% on tooling and still reverse order once the tool is running. The reason is that the mold is a small fraction of what a program costs, and the part price is a function of cycle time, scrap and tool life — three things a cheap tool is designed to be bad at.
| Cost line | What drives it | How it hides |
|---|---|---|
| Tool design and build | Cavity count, steel, sliders, hot runner, texture, tolerance demand | Quoted as one number; the steel grade and the cavity count are where it varies |
| Sampling and correction | How many loops the tool needs, and who pays for them | Often excluded from the tool price and billed later as "modifications" |
| Part price | Cycle time, cavities, resin, machine rate, scrap allowance | A low part price with a long cycle is a machine-hour subsidy you pay for later |
| Cycle time | Wall thickness, cooling design, gate, ejection | Two seconds on a 30-second cycle is about 55 hours of machine time per 100,000 parts |
| Scrap and rework | Process capability, cosmetic standard, assembly yield | Stated as a percentage; rarely stated as who pays for it |
| Secondary operations | Printing, plating, ultrasonic welding, assembly, packing | Quoted separately, so the total is only visible when you add it up yourself |
| Inspection | Which characteristics are reported, and how often | Free in the quote, absent in the shipment |
| Freight, duty, clearance | Volume, packaging density, Incoterms, destination | Excluded from the part price and larger than expected on bulky parts |
| Tool maintenance and replacement | Shot volume against tool life, and the maintenance regime | Invisible until year three, when the second tool is needed |
This is the argument for comparing on total cost of ownership rather than on unit price, but it only works if the comparison is made on the same assumptions. Before you compare three quotations, write down the five numbers that must be identical across them: cavity count, steel grade, resin grade, annual volume, and the inspection scope. If any of those differ, the prices are not comparable and the lowest one is probably measuring a smaller scope.
Engineering Change Control: What Has to Be Notified
A validated part is a set of conditions that happened to produce good parts. Change one condition and the validation no longer describes what is being shipped. The useful question for a buyer is not whether the supplier has a change procedure, but which changes trigger it.
| Change | Why it matters | What should happen before it is implemented |
|---|---|---|
| Resin grade or manufacturer | Shrinkage, flow and color all move | Written notice, customer approval, re-sampling with dimensional report |
| Regrind ratio | Mechanical properties and color shift | Declared ratio held in the process sheet; changes notified |
| Machine or site | The process was developed on a specific machine | Notification, trial run, comparison against the golden sample |
| Process parameters | The validated window is the evidence of capability | Frozen sheet; any deviation re-validated, not adjusted on the floor |
| Tool modification | Every cut in steel is a permanent change to the part | Approval before cutting, change record, re-measurement after |
| Subcontractor | Adds a party you have not qualified | Declaration and, for critical steps, approval |
| Drawing revision | Most fitment failures are a correct part made to an old revision | Revision on the traveller, checked at first-off, recorded |
Two of these are worth negotiating into the contract rather than assuming. Subcontracting is the one that most often appears after the fact: plating, printing and assembly are commonly outsourced, and occasionally molding itself is, in a busy quarter. Tool modification is the one with the longest memory: a cavity welded and re-cut is not the tool that was validated, and if nobody wrote it down, the dimensional history becomes unreadable.
Supplier Audit Checklist: Ten Questions and the Evidence That Answers Them
This is the page's working asset. Each row is a question an OEM buyer can ask on a call or in an audit, the evidence that answers it, and the reason the evidence matters. None of them require a factory visit to start; all of them are worth a visit to confirm.
| Dimension | Core question | Evidence to request | Why it matters |
|---|---|---|---|
| Factory identity | Who is the legal entity, and where is the part actually made? | Business license, certificate with site address and scope, walk-round video showing the machines | Determines who answers if something goes wrong, and whether the audit describes the real site |
| Tooling ownership | Who owns the mold, and who may move it? | Tool clause in the PO, tool number in the asset register, transfer procedure | A tool you cannot move is a tool you do not control, whatever the invoice says |
| Engineering | Can they review the design before steel, and did they? | A real DFM report with named features and change proposals | Every change after the tool is cut costs an order of magnitude more |
| Resin control | Which grade, from which maker, dried how? | Grade code, certificate of analysis per lot, dryer specification, regrind ratio | Family-level material promises hide the variable that breaks a validated process |
| Sampling | What does a T1 submission contain, and who approves it? | Defined gates in the PO, cavity-by-cavity parts, dimensional report, golden sample | The vocabulary varies by supplier; only the written definition is shared |
| Tolerances | Which dimensions are functional, and how were they set? | Drawing with a short critical list, measurement timing, T1 measured results | Molded plastic cannot hold a metal-style tolerance across every dimension |
| Process control | Is there a frozen process sheet, and is it used? | Parameter sheet, part weight trend, parameter check at production start | Consistency is a record before it is a promise |
| Quality system | What is certified, for which site, and what is project-specific? | Certificate with scope, inspection plan, nonconformance procedure, sample reports | Certificates describe a system; reports describe your parts |
| Capacity | Can they take the volume in the month you need it? | Machine list with tonnage and status, molding schedule, current load estimate | A capability that is already committed to another customer is not capacity |
| Change control | What triggers a notification, and who approves it? | Written change procedure, subcontracting declaration, revision control on the traveller | The third year is where undocumented change becomes visible |
Read the table as a sequence rather than a checklist. Identity and ownership are settled before the order; engineering before steel; resin, sampling and tolerance at T1; process control, quality documents and change control across production; capacity whenever the forecast moves. A supplier who can answer the first three well is usually worth the effort of the last seven.
What to Put in an Injection Molding RFQ
Most slow quotations are not the supplier's fault. A drawing without a material, a volume and a cosmetic standard cannot be priced, so the supplier either asks four questions or guesses — and a guess is what you will be comparing against another guess.
| Item | What it should contain |
|---|---|
| 3D model and 2D drawing | STEP at a named revision, plus a drawing with tolerances, datums and the critical characteristics marked |
| Material | Grade code and maker where specified; otherwise the performance requirement, so the grade can be proposed and agreed |
| Annual volume and call-off | Annual quantity, typical order size, and whether the volume is firm or forecast |
| Cavity expectation | Whether the tool should be single-cavity for simplicity or multi-cavity to hit a unit price |
| Cosmetic standard | Which surfaces are visible, what texture, and which defects are unacceptable — ideally with a photo or a sample |
| Critical dimensions | The short list that decides fit and function, with tolerances; the rest can stay general |
| Color | Pantone or RAL reference, masterbatch expectation, and whether a color chip must be approved first |
| Application conditions | Temperature, chemicals, UV, load, and whether the part is a safety or sealing element |
| Tool ownership | Who owns the tool, whether it must be transferable, and whether tool drawings are a deliverable |
| Inspection requirement | Whether you need FAI, dimensional report, cavity report, material certificate, SPC or PPAP |
| Secondary operations | Printing, plating, welding, assembly, and whether they are in scope or bought separately |
| Delivery terms | Incoterm, destination, packaging specification, and whether parts ship in bulk or kitted |
Two of those items change the answer more than the rest. Cavity expectation sets the tool cost and the unit price against each other, and a supplier cannot optimize both without knowing which one you are buying. Tool ownership decides whether the quotation is for a tool or for a capability, and it is the line that most often gets agreed verbally and forgotten in the PO.
Where Our Scope Starts and Stops
This page is written from the buyer's side, so it would be inconsistent to close it with a claim we cannot evidence. What follows is the honest version.
| We do | We do not |
|---|---|
| Design and build injection molds, and run production on them | Claim a certified medical or automotive quality system we do not hold |
| Review a part before steel, and say what we would change | Own the product design, the risk assessment or the regulatory file |
| Machine to a specified resin grade, and supply the lot certificate we receive | Guarantee a material's performance in your application — that is a design and test question |
| Submit T1 samples from every cavity with a measured report | Approve our own samples on your behalf |
| Hold a client's tool, maintain it and transfer it on instruction | Promise a tool life in shots without stating the steel, the resin and the maintenance regime behind it |
| Apply ISO 9001:2015 controls and project-specific documentation per order | Present ISO 9001 as if it were ISO 13485 or IATF 16949 |
That last row is the one worth repeating to a colleague. ISO 9001 says a process is defined and followed; ISO 13485 and IATF 16949 add sector-specific requirements that a general molder does not automatically meet. If your program needs them, ask for the certificate and read the scope — and if it does not exist, that is a planning input, not a negotiating position.
Frequently Asked Questions
How do I know whether a Chinese injection molding supplier is a real factory?
Who owns the injection mold when I source from China?
What is the difference between T0 and T1 samples?
How many parts should a T1 sample submission contain?
How do I verify the plastic resin grade a supplier actually used?
Can molded plastic parts hold the same tolerances as machined metal parts?
How can I tell if a supplier's DFM review is real?
What quality documents should I expect from a Chinese molder?
Is ISO 9001 enough for a medical or automotive molding project?
How do I compare injection molding quotations from China fairly?
What happens to my mold if I stop ordering?
Can I start with a prototype tool and move to a production tool later?
Send the Part, the Volume and the Standard You Will Judge It By
Share the 3D model and drawing at a named revision, the resin grade or the performance requirement, the annual volume and call-off pattern, the surfaces that are visible, and the inspection documents your quality team will ask for. The review covers the tool concept, the DFM changes worth making before steel, the sampling gates and what a T1 submission will contain — and anything that cannot be molded as drawn is raised before the quotation rather than at the first trial.
Request an OEM Molding QuoteSTEP, IGES, X_T, DXF, DWG or PDF · prototype tooling through production molds
See our injection molding capabilities →Related Pages in This Cluster
Services
Custom injection molding services — process families, capability matrix and production workflow.
Tooling
Custom plastic injection mold — mold types, steel selection, T0/T1 and mold life.
Medical
Medical plastic injection molding — how medical projects are controlled and documented.
Technical
Thin-wall injection molding — what changes when the wall goes below one millimeter.
Components
Custom plastic components — the wider plastics scope across processes.
Quality
Quality and certifications — what our system covers, and what it does not.
Xiamen Goldcattle Plastic & Metal Products Co., Ltd. designs and builds injection molds and runs production molding in Xiamen, China, with in-house tool making, resin and lot traceability, first article and dimensional inspection, and tool storage, maintenance and transfer by agreement, under an ISO 9001:2015 quality management system with project-level controls applied per order. This page is a buyer's guide to qualifying a Chinese molding supplier, including the questions we expect to be asked. We do not claim ISO 13485 or IATF 16949 certification; where a program requires either, that requirement is resolved at supplier approval rather than asserted here. Resin grades, tolerances, tool life, sampling gates and inspection scope are confirmed per project at drawing review.