Custom Tooling & Production Dies

Custom Tool & Die Manufacturing: Scope, Validation and RFQ Guide

A die is not a purchased consumable; it is a production asset that has to fit your press, survive your run rate and stay serviceable for the life of the programme. This page is the entry point for buyers who hold a part drawing and need to decide what tooling to commission, what the supplier is responsible for, and what an RFQ must contain before a quotation means anything.

See the five tooling categories ↓
A complete custom progressive metal stamping die assembly with upper and lower die halves, guide pillars, punches and polished tool steel plates in silver, blue and gold tones on a light studio surface (illustrative).

At a Glance

Page typeCross-process tooling entry / buyer's guide
Core questionWhat tooling, what scope, what validation
Supplier modelDirect manufacturer, engineer-reviewed RFQ
Tooling outputDrawing-based tool, not an approved production process
Drawing basisApproved 2D drawing, 3D CAD and buyer tooling standard
MOQ1 piece
Order typesPrototype, production tooling, replacement components
EstablishedFounded in 1998
Quick Answer

Tool and die manufacturing is the engineering and production of the specialised tools, dies, moulds and precision components used to cut, form or hold material in a manufacturing process. The work covers design review, tool steel selection, precision machining, fitting, assembly, tryout and maintenance. Critical characteristics, validation records and acceptance criteria come from the approved product drawing and the buyer's tooling standard, not from a general machine list. Xiamen Goldcattle Plastic & Metal Products Co., Ltd. is a direct manufacturer working to approved drawings and CAD data; we are not a tooling marketplace and we do not publish automated instantaneous pricing. A tool that measures correctly is a manufacturing asset; it is not, by itself, an approved production process. This page exists because most tooling disputes begin with an undefined scope — who owns the design, which press the tool must fit, and what counts as acceptance — rather than with a machining error.

1. Five Tooling Categories, and Which Page Owns Each

Definition for quoting

Tool and die manufacturing covers the tools that shape, cut or hold material in production. It is broader than mold making, and it is not the same as machining a single jig or fixture. A tooling programme normally joins a product drawing to a die structure, a set of precision components, a validation plan and a maintenance route. Those five elements are what a buyer is actually commissioning.

The site already carries dedicated pages for individual tooling families. This page is deliberately not another one of them. It is the cross-process entry: it tells you which category a request belongs to, what that category produces, and where the technical detail lives. Choosing the wrong category at RFQ stage is a common reason for a quotation that has to be rebuilt.

Tooling categoryWhat the buyer receivesGoverning inputsWhere the detail lives
Metal stamping diesDie sets for piercing, blanking, bending, forming and progressive strip productionPart geometry, sheet grade and thickness, strip layout, press and feed conditionsCustom Stamping Metal Dies
Plastic injection mold toolingMold bases, cores, cavities, runner and cooling structures, insertsResin grade, part geometry, cavity count, moulding machine interfaceInjection Mold Manufacturing
Die casting toolingDies, core and cavity inserts, runner and gate components for non-ferrous alloysAlloy, part geometry, casting machine interface, thermal conditionsDie Casting Services
Precision tooling componentsPunches, die inserts, stripper and die plates, guide components, ground blocks, replacement partsComponent drawing, grade and condition, fit and surface requirementsReviewed from the component drawing at RFQ stage
Production tooling supportModification, refurbishment and spare component manufacture for an existing toolExisting design data, revision state, buyer engineering change procedureScope agreed per project

Reading the table: the third column is what turns a product enquiry into a tooling enquiry. A request that gives only a part name and an annual quantity cannot yet be routed, because the same component may be produced by a stamping die, an injection mold or a die casting die depending on material and geometry.

For a cross-process view of how these capabilities sit together, see manufacturing services. Machining capability behind the tooling work is described under CNC machining services.

2. What Is in Scope — and What Must Be Agreed

Tooling suppliers are often judged on a machine list, but the commercial risk sits in the boundary between the tool and the production process that uses it. The table below separates what a drawing-based tooling manufacturer supplies, what has to be written into the order, and what belongs to the equipment or product owner.

ActivityStatus in a tooling orderWhy the distinction matters
Drawing, 3D model and tooling standard reviewIn scope, before quotationRoute, datum scheme and inspection feasibility cannot be judged from a photograph.
Die structure planning, DFM and machining feasibility reviewIn scope, to the approved drawingDetermines how the tool will be built and which features are critical to quality.
Precision machining, EDM, grinding, fitting and assemblyIn scope, to the approved drawingThese produce the tool components and bring them into the agreed alignment and clearance.
Tool steel grade, heat treatment and surface treatmentAgreed at RFQRequirements come from the buyer specification and can change a finished dimension.
Tryout conditions, press availability and sample partsAgreed at RFQValidation can take place on different equipment and under different criteria; this must be explicit.
First article, dimensional and material documentationAgreed at RFQYour receiving quality system defines which records are required.
Product design, material suitability for service and duty calculationsOwner responsibilityThese belong to the product designer, not to the tool builder.
Production approval and ongoing part conformityOwner responsibilityA conforming tool does not by itself establish an approved mass-production process.

Validation boundary. Tryout conditions, press availability, first article documentation and production approval are defined at RFQ stage and confirmed per project. Testing and validation of this kind are evaluated per project and are not offered as a uniform in-house service.

That boundary is why this page publishes no press tonnage, no maximum die size, no stated tool-life figure and no promised sample lead time. Those values depend on the specific tool, the buyer's equipment and the order scope. Where a project needs a stated tryout press, a particular sample stage or a defined acceptance run, the responsible party, the equipment and the acceptance criterion are written into the quotation rather than implied by a capability list.

3. Who Uses This Page

Four groups arrive at a tooling enquiry with different documents and different definitions of success. Recognising which one you are saves a round of clarification before quotation.

Buyer typeWhat they are commissioningWhat they need to clarify first
Automotive and EV component manufacturersProduction stamping dies and forming tools for structural, bracket, shielding and connector partsWhich approval and documentation package applies, and how engineering changes are controlled
Electronics and electrical OEMsSmall-precision dies for terminals, lead frames and shielding partsEdge condition, burr expectation, punch-to-die clearance and wear-part replacement
Industrial equipment and appliance makersEnclosure, bracket and structural forming dies; injection and die casting toolingTarget volume, press interface, maintenance access and modification flexibility
Tooling distributors and sourcing companiesPunches, inserts, plates, guide components and replacement tooling partsDrawing revision, material certificate requirements and repeat-order traceability

These categories describe the purchasing situation, not a claim about end-market qualifications. Whether a tool is destined for a regulated product, a clean environment or a particular industry quality regime is a property of the buyer's project and specification; it is not established by the fact that a tool shop machined the die. We do not present a tooling order as evidence of product-level certification.

4. Die Structure, Stations and the Machining Behind Them

The two schematics below are feature maps, not designs. They name the structures that a tooling drawing and a strip layout must define, and they show how a carrier strip progresses through stations. Use them as a checklist against your own drawing package.

Schematic cross-section of a progressive stamping die with eight numbered markers naming upper die shoe, punch holder, stripper plate, strip feed direction, die inserts, die plate, guide pillars and lower die shoe, with a text legend (illustrative schematic, not to scale, not an engineering drawing).
Schematic — not to scale — not an engineering drawing — no dimensions, tolerances, press data, tonnage or tool-life values implied.
Schematic strip layout showing a carrier strip with six numbered stations for piercing pilots, piercing holes, blanking a window, forming, calibration and cut-off, with a feed-direction arrow and a station-purpose legend (illustrative schematic, not to scale, not an engineering drawing).
Station count and sequence are illustrative; the approved strip layout governs manufacture. No pitch, dimensions, tolerances or production values implied.

A die is a set of related interfaces rather than a block of steel. The die shoes interface with the press; the guide pillars and bushings hold the upper and lower halves in alignment; the punch holder locates the cutting elements; the stripper releases the carrier; the die plate carries replaceable inserts; and the strip layout decides which operation happens at which station. If one of these is missing from the drawing package, the quotation is built on an assumption.

A curated set of precision tooling components including hardened steel punches, wire-EDM die inserts, guide pins and bushings, precision ground blocks and stripper plates in silver, gold and bright blue tones on a light studio surface (illustrative).
Precision tooling components: the fit between punches, inserts and guide parts is what the inspection plan has to cover.
ProcessWhat it produces in a toolCharacteristic to agree before cutting
CNC millingDie shoes, plates, pockets, cavities and complex structural facesDatum scheme, flatness of mounting faces, stock allowance for heat treatment
CNC turningGuide pins, bushings, round inserts and cylindrical componentsFit class, concentricity and surface finish of the guide interface
Wire EDMPunch profiles, die insert openings, sharp internal contours in hardened steelCorner radii, wire-path access and the specified cutting clearance
Sinker EDMCavities and internal detail a rotating cutter cannot reachElectrode strategy, surface condition and post-EDM finishing
Surface and profile grindingFlatness of plates, guide faces, cutting edges and fitting surfacesParallelism, size after heat treatment and protection of ground edges
Fitting and assemblyAlignment of the assembled halves, stripper travel and punch-to-die clearanceClearance definition, travel check and how the result is recorded
Wire electrical discharge machine cutting a complex pattern of square openings in a hardened tool steel die plate, with a fine brass wire, a red machine housing and brushed steel surfaces (illustrative).
Wire EDM produces the punch and insert profiles that define cutting clearance; the approved drawing, not a machine specification, sets the target.

Tolerance basis. The drawing standard is the authority. We work to ASME Y14.5-2018 (R2024) or to ISO GPS / ISO 22081:2021 as declared on the customer drawing, and these frameworks are not interchangeable. Tight values are evaluated per feature and only on qualified features, never uniformly across the whole part; we do not apply one blanket value across the whole part and there is no blanket part-wide value or blanket ISO 2768-mK default. Achievable fits, finishes, clearances and processing figures are initial engineering references confirmed per project, not fixed values. Fixed-angle features are often cut in 3+2 indexed mode; Simultaneous 5-axis is not assumed as the default route.

5. Matching the Tool to Your Press and Production Line

A die can be dimensionally correct and still be unusable in the plant it was bought for. Professional tooling RFQs carry the equipment interface as part of the specification, because shut height, bolster layout, feed direction and coil width constrain the die structure from the first design decision. The table below is the information list we ask for; it is not a set of values we publish.

Interface itemWhy the tool designer needs itWhat goes wrong if it is missing
Press capacity and typeSets the force and structural envelope the die has to work withinDie structure sized against the wrong machine
Bolster dimensions and mounting patternDefines the lower shoe footprint and clamping arrangementTool cannot be clamped without rework
Shut height and stroke lengthControls the closed and open height of the assembled dieDie cannot close, or the strip cannot be fed
Feed direction and feed pitchDetermines the station sequence and carrier layoutStations land in the wrong order relative to the line
Coil or strip width and material thicknessGoverns strip layout, clearance and forming behaviourIncorrect blank development and forming defects
Target production speedInfluences stripper design, wear parts and maintenance accessTool runs below the required rate or wears prematurely
Automation and ejection interfaceDefines how parts and scrap leave the toolPart evacuation conflicts with the line
Buyer tooling standardSets component identification, spare parts and documentation rulesAcceptance fails on documentation, not on geometry

Matching is a joint review, not a catalogue lookup. Where the buyer cannot release full press data at enquiry stage, that limitation should be stated in the RFQ so the quotation records which interfaces remain to be confirmed. A drawing that specifies the die outline but omits the feed direction is not yet a complete tooling specification.

6. From Engineering Review to Tryout, Approval and Change

The commercial value of a tooling project lies in getting from an approved drawing to a stable, maintainable production asset. The table below describes the buyer's decision points; it is a review sequence, not a promise that every project passes through every stage.

A stamping die set mounted in a modern press during a tryout, with freshly stamped bright sheet metal parts and a short strip of sheet metal beside it, in cool blue-white factory lighting (illustrative).
Tryout validates the tool against parts, not against a machine list. Test object, equipment and acceptance criteria are agreed at RFQ stage.
StageOutput you should receiveYour decision
RFQ and engineering reviewQuestions on category, press interface, critical features and document scopeConfirm the drawing revision and which tooling category applies
QuotationA defined tooling, treatment, validation and documentation scope tied to that revisionApprove the scope, not only the unit figure
Design review and approvalDie structure, strip layout and datum scheme for sign-off where the order requires itRelease the design or request a documented change
Manufacture and assemblyMachined, ground, fitted and assembled tool to the agreed characteristicsConfirm which characteristics appear in the inspection plan
Tryout and sample evaluationSample parts and tryout records under the agreed conditionsAssess parts against the drawing, not the tool's appearance
First article and acceptanceFirst article inspection documentation where the order requires itRelease the tool or request corrective action
Production and change controlRevision-controlled repeat orders and agreed spare component supplyIssue engineering changes as new revisions, not shop-floor notes

Tryout deserves particular care. The conditions that matter — the press used, whether automatic feeding is simulated, how many sample parts are produced, what stage the samples represent and who signs the record — are project terms. We state the responsible party and the acceptance criteria in the RFQ response rather than implying a standard in-house tryout service. A first article report on sample parts is not the same thing as a production approval submission, and neither is established by a photograph of a die.

7. Standards, Acceptance and Documentation

ISO 9001:2015 is certified. AS9100-aligned process controls, ISO 13485-aligned process controls, ISO 14001-aligned environmental practices and FAI reports per AS9102 on request describe process alignment and documentation; they are not additional certifications, and we make no claim of blanket third-party product certification. Our certification overview is on the quality certifications page.

A coordinate measuring machine touch probe measuring a precision ground die insert on a granite inspection table, with a hardness tester block and gauge pins nearby, in bright blue and silver laboratory lighting (illustrative).
Inspection confirms the characteristics that are accessible and agreed in the order; it does not by itself approve a production process.
Standard or recordWhat it actually meansHow it applies to a tooling order
ISO 9001:2015The factory quality management systemProvides the system framework; it does not mean every tool automatically meets all customer requirements
PPAPA production part approval process, not a supplier certificationWhere a buyer requires a submission level or format, state it at RFQ so it is planned into the job
AS9102 FAIA first article inspection reporting standard, not evidence of AS9100 certificationFirst article documentation is supplied only where the order calls for it
ASME Y14.5 / ISO GPSThe drawing language for geometric dimensioning and tolerancingThe standard declared on the drawing governs the callouts; the two frameworks are not interchangeable
ASTM A681 and material specificationsSpecifications for applicable tool steelsGrade, condition and certificate requirements come from the approved drawing and order
Customer tooling standardsOEM rules for die structure, component identification, spares and acceptanceSupplied by the buyer and reviewed before the design is released
Dimensional and material recordsReports, certificates, component identification, tryout and change recordsWhich documents are actually issued is agreed at RFQ, not assumed from a capability list

Document scope is a commercial decision as much as a technical one. A prototype tool may need only an agreed dimensional check, while a repeat production order may need first article documentation, material and heat treatment records, tool component identification, tryout records, spare parts documentation and engineering change records. Tell us which records your receiving inspection requires so they are priced and planned into the job. Inspection documents, testing, NDA terms and file-retention practice are confirmed per project.

8. Tooling Ownership, Design Data and Confidentiality

Tooling is a durable asset, and the terms around it are commercial rather than technical. European and North American OEM buyers usually want these points settled before a purchase order is issued. None of them should be inferred from a tooling price.

Ownership and transferWho owns the physical tool, whether it may be exported or moved, and under what conditions.
Design data rightsOwnership and permitted use of CAD and CAM data, strip layouts and electrode geometry.
ConfidentialityNDA terms and controlled-data handling, confirmed per project.
Maintenance and sparesWhether third-party maintenance is permitted and whether wear parts can be purchased independently.
TermWhere it is recordedWhy it must be explicit
Tool ownershipPurchase order and project fileDetermines who may move, modify or duplicate the tool
CAD / CAM data rightsOrder and NDAPrevents a later dispute over design reuse
Tool storage and identificationProject documentationSupports revision control and future spare part orders
Third-party maintenanceOrder termsAffects how wear parts and drawings are released
Spare component supplyRFQ and orderDefines whether punches and inserts can be ordered separately

We make no free-shipping promise and no guarantee of a specific price or delivery date before review. NDA terms, file-retention practice and the handling of controlled customer data are confirmed per project, and should be raised at RFQ stage along with the ownership terms above so the quotation and the project file record the same understanding.

9. Initial Tooling Investment vs Cost per Part

The lowest-priced tool is frequently not the lowest-cost production route. A die that needs frequent regrinding, adjustment or replacement carries maintenance labour, spare parts and downtime costs that do not appear in the initial tooling price. Evaluating the two together is one of the most useful things a buyer can do before approving a tooling quotation.

Overhead arrangement of tooling maintenance spare parts including replacement steel punches, spare die inserts, guide pins, reground cutting edge inserts and precision ground shims on a light surface with blue accents (illustrative).
Wear parts are a design decision, not an afterthought: access, identification and replacement drive lifetime cost.
Cost elementWhat drives itQuestion to ask at RFQ
Initial tooling investmentDie structure, station count, steel grade, machining and validation scopeIs the quoted scope a bridge tool or a production tool?
Maintenance and regrindingWear-part access, cutting clearance, operating conditionsWhich components are designed as replaceable inserts?
Spare component supplyIdentification, drawing availability, repeat-order lead timeCan punches and inserts be ordered independently?
Downtime exposureChangeover time, adjustment frequency, troubleshooting accessHow quickly can a worn station be restored?
Expected production volumeProgramme life, batch pattern and design changesDoes the structure still make sense at the stated volume?
Engineering changesRevision control, modification access, redesign effortHow are changes issued and quoted?

No invented savings: we do not publish a percentage reduction in tooling cost, cycle time or downtime on this page. A comparison of two die concepts is only meaningful on one real part, with one real drawing, one stated volume and one defined scope. Tool life is evaluated according to the stamped material, part geometry, tooling steel, heat treatment, operating conditions and maintenance requirements; expected production life is confirmed during project review rather than stated as a fixed figure.

10. What to Send for a Tooling Quotation

The most useful RFQ lets an engineer decide the tooling category, the die structure and the inspection scope without a second round of questions. The table below is a preparation checklist for your own team; this page carries no input form. Use the button to open our quote window when the package is ready.

Documentation categoryWhat to provideWhy it changes the quotation
Part drawingDimensioned 2D PDF or DWG at the approved revisionDefines acceptance criteria and the drawing standard
3D CAD modelSTEP, IGES or an agreed native format at the same revisionAllows geometry and forming features to be checked
Part materialGrade, condition and the standard it must meetDetermines clearance, wear behaviour and tool steel choice
Material thicknessNominal sheet thickness and toleranceGoverns blank development and cutting clearance
Annual volumeExpected volume and batch patternInfluences die structure and station count
Tooling categoryStamping die, injection mold, die casting tool or component-only orderRoutes the enquiry to the correct specialty scope
Part geometryHoles, bends, draws, forms and critical interfacesDetermines the station sequence and forming strategy
Critical tolerancesGD&T, key dimensions and geometric calloutsDetermines the inspection plan and its cost
Press informationCapacity, bolster, shut height, stroke and mountingDefines the die's mechanical interface
Feeding detailsCoil or strip width, feed direction and pitchDefines the carrier and station layout
Target tool lifeExpected production life and maintenance expectationsInfluences insert design, steel grade and treatment
ValidationTryout, sample stage, first article and approval requirementsDefines who validates and what is recorded
Tool ownershipOwnership, data rights, transfer and NDA requirementsCommercial terms that belong in the quotation
Spare partsWear-part list and expected repeat-order patternPlans replacement components into the design
DeliveryTarget dates, packing, protection and freight termsProtects ground faces and sealing surfaces in transit
Drawing and specification package
Drawing set2D drawing at revision + 3D model + part geometry notes
MaterialGrade, condition, thickness, certificate requirement
EquipmentPress interface, feed direction, coil width, target rate
VolumeExpected annual volume and batch pattern
Quality and commercial scope
Critical featuresGD&T and characteristics that control fit or function
ValidationTryout, sample stage, FAI and approval documents
OwnershipTool and data rights, NDA terms, spare part supply
StandardsDrawing standard and any buyer tooling standard
Order pattern
Tool typePrototype, bridge, production or replacement components
QuantitiesFirst tool plus expected repeat or spare orders
Revision controlHow drawing and design changes are issued
DeliveryPacking, face protection and freight terms

This is a preparation checklist and carries no input form. Click Submit Your Tooling Drawings to open our quote window, or review the instant CNC quote page for the submission route. We make no free-shipping promise and no guarantee of a specific price or delivery date before review.

Have a tooling package ready for review?

Send the drawing set, the press and feeding information and the validation documents you require. You will get an engineering review of the tooling category, the critical interfaces, the verification coverage and the scope boundaries before a quotation is issued.

11. How to Evaluate a Tooling Supplier

Procurement teams reduce risk by converting vague promises into verifiable answers. The questions below are operational on purpose: a capable supplier answers in terms of drawings, methods and documents, while an unreliable one answers in adjectives. Use them when two quotations look similar in price but differ in scope.

Ask thisA useful answer sounds likeWarning sign
Which features are critical to quality on this tool?Named bores, cutting clearances, guide fits and datum relationshipsOne blanket tolerance applied to the entire tool
How will tryout be performed and recorded?A stated test object, equipment, sample stage, criteria and responsible partyA vague in-house tryout claim with no defined conditions
How is tool life estimated?Referenced to material, geometry, steel, treatment and maintenance conditionsA fixed stroke count presented as universally applicable
Which documents come with the shipment?A list tied to the purchase order, with the issuing party and revisionGeneral factory certificates offered as proof for an unnamed order
Who owns the tool and the design data?Terms written into the order and NDAOwnership treated as obvious or never discussed
How are engineering changes handled?A named revision on the quotation, design file and production routerVerbal changes accepted without an updated drawing
Can wear parts be ordered independently?Identified inserts and punches with a repeat-order routeNo spare part strategy beyond the initial tool
What is excluded from the quoted scope?A written split between tool, validation and production approvalAn assumption that a tool price includes process approval

None of these questions requires a supplier to claim the largest press or the lowest price. They test whether the supplier can describe a controlled process and its limits. That is usually a better predictor of a smooth first article than a capability list, and it is why this page publishes boundaries rather than superlatives.

12. Frequently Asked Questions

What is tool and die manufacturing?
It is the engineering and production of the specialised tools, dies, moulds and precision components used to cut, form or hold material in a manufacturing process. The work covers design review, tool steel selection, precision machining, fitting, assembly, tryout and maintenance. Critical characteristics, validation records and acceptance criteria come from the approved product drawing and the buyer's tooling standard, not from a general machine list. A tool that measures correctly is a manufacturing asset; it is not by itself an approved production process.
What types of tooling can Goldcattle manufacture?
Tooling work is grouped into metal stamping dies, plastic injection mold tooling, die casting tooling and precision tooling components such as punches, inserts, plates and guide parts, together with production tooling support. Each category has its own dedicated page on this site with the relevant technical detail. This page is the entry point: it explains the scope, the interfaces and the purchasing decisions that apply across all of them, rather than repeating the specialty content.
What is the difference between progressive and compound dies?
A compound die performs several cutting operations in one press stroke at a single station, which keeps the relative position of those features tight. A progressive die feeds a carrier strip through a sequence of stations, with each station doing part of the work until the finished component is cut off. Progressive tooling suits higher-volume strip-fed production; compound tooling is often evaluated where feature-to-feature position in one stroke matters more than throughput. The choice depends on part geometry, material, thickness, annual volume and the buyer's press and feeding equipment, not on volume alone.
Can you manufacture custom tooling from CAD drawings?
Yes, for drawing-based tooling work. Send a dimensioned 2D drawing at the approved revision, a 3D model in STEP or an agreed equivalent, the part material and thickness, the target annual volume, the press and feeding information, the critical tolerances and the validation documents your receiving quality system requires. We review the geometry, die structure, datum scheme, machining route and inspection scope before quoting. We do not quote a tooling project from a photograph or a product description alone.
Which materials are used for precision tooling?
Tool steel and mold steel are selected to the grade and condition on the approved drawing. Commonly specified families include cold-work tool steels such as SKD11, DC53, D2 and Cr12MoV, hot-work grades such as H13 for applicable die casting tooling, and mold steels such as P20, S136 and NAK80. Grade choice belongs to the tooling design and the buyer's material specification; it depends on the workpiece material, wear conditions, heat treatment state and required surface finish. We do not publish a fixed hardness or tool-life value that applies across every project.
What machining processes are used in tool and die manufacturing?
The processes are chosen for the feature being made. CNC milling produces die shoes, plates, pockets, cavities and complex structural faces; wire EDM cuts punch profiles, die insert openings and sharp internal contours in hardened steel; sinker EDM handles cavities that a rotating cutter cannot reach; surface and profile grinding establishes flatness, guide faces and fitting surfaces; turning produces guide pins, bushings and round components. Fitting and assembly then bring those parts into the agreed alignment and clearance. Which of these are used, and which inspection method verifies each, is defined during project review.
Can you provide prototype tooling?
Prototype and low-volume tooling can be evaluated separately from production tooling. A prototype tool is normally built to validate geometry and forming behaviour with a limited number of parts, while a production tool must also address the target run rate, maintenance access, spare components and repeatability. The two have different design and cost logic. State at RFQ stage whether you need a bridge tool, a production tool, or replacement components for an existing tool, so the quoted scope matches the actual decision.
Do you provide tooling repair and spare parts?
Replacement punches, die inserts, guide components and other wear parts can be produced to approved drawings, and regrinding, modification or refurbishment requirements can be reviewed for an existing tool. The exact scope depends on whether the original design data is available, whether the tool was built by us, and what the buyer's engineering change procedure requires. These activities are evaluated per project and are not offered as a uniform in-house service; nothing on this page should be read as a blanket maintenance programme.
Can you provide FAI and PPAP documentation?
Documentation scope is agreed at quotation, not assumed. Depending on the order, the package can include a dimensional inspection report, CMM measurement of agreed characteristics, first article inspection documentation, material and heat treatment records, tool component identification and tryout records. PPAP is a production part approval process, not a supplier certification, and AS9102 is a first article inspection standard, not evidence of AS9100 certification. Where a buyer requires a specific submission level or report format, state it in the RFQ so the work is planned and priced into the job.
Who owns the tooling after manufacturing?
Tooling ownership, CAD and CAM data rights, storage, export or transfer, third-party maintenance and the right to purchase spare components independently are commercial terms that belong in the order. We do not assume any of them. Raise these points at RFQ stage along with NDA terms and controlled-data handling requirements, so the quotation and the project file record the same understanding. These terms are confirmed per project and should not be inferred from a tooling price alone.

Define the scope before you release the drawing

Send the part drawing, the 3D model, the press and feeding information and the documents your receiving inspection requires. We will reply with the tooling category, the validation scope, the ownership terms and the inspection coverage written into the quotation — from a prototype tool to revision-controlled repeat orders.

Xiamen Goldcattle Plastic & Metal Products Co., Ltd. — Founded in 1998 · Customers in 100+ countries · ISO 9001:2015 certified.